After-sales Service: | 24 Hours |
---|---|
Warranty: | 1 Year |
Power: | 1~50MW |
Suppliers with verified business licenses
High Efficiency Small Back Pressure Steam Turbine Generator, Condensing 1 MW Steam Turbine, Biomass Steam Turbine Generator |
Cogenerating steam turbine, working as a main mover in a thermal power station and having a broad range of application in various industries.
Power up to 30MW, covering various inlet and exhaust conditions.
Additional fixed bleed points
Simple construction, convenient installation, smooth running and high efficiency.
Models for Reference
No. | Output Power (MW) | Inlet Pressure (MPa) |
Inlet Temp. (°C) |
Inlet Flow (t/h) | Exhaust Pressure (MPa) |
1 | 0.75 | 1.27 | 340 | 25 | 0.49 |
2 | 1 | 2.35 | 390 | 15 | 0.294 |
3 | 1.5 | 2.35 | 390 | 40 | 0.785 |
4 | 3 | 3.43 | 435 | 45 | 0.981 |
5 | 6 | 3.43 | 435 | 62 | 0.294 |
1.Q:Where can I get product&price information?
A:Send us e-mail or leave message , we will contact you as we receive your mail or message.
2.Q: How soon can I get quotation?
A: Depending on your specific, it usually takes 3-5 days.
3.Q: Which kinds of steam turbine& generator spare can you supply?
A: We can supply the spare parts for max 60MW steam turbine& generator, made by Qingdao, Wuhan, Nanjing, Luoyang, Hangzhou, Dongfang.
4. Q:What kind of service can you provide?
A: We can provide overhaul (maintenance ) of steam turbine& generator, upgrade of steam turbine (improve efficiency).
5.Q: Can you make machining parts based on our drawings?
A: Yes, we can machining parts based on your drawing.
6.Q: Is it possible to know how are my products going on without visiting your company?
A: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which show the machining progress.
7. Q: What is the delivery time?
A: Normally the delivery time is 2 months to customer site for spare parts. The overhaul period is around 2 months.
We will calculate the exact data as per your inquiry.